Performance Reports

At Premium Drilling Tools, we strive for excellence in every aspect of drilling technology.

8 ½’’ SUD516VHRPX-PDT3v1

Performance Report
Horizontal-SLB RSS

with “Fit For Purpose” RSS features & XL Forced® cutters drilled ERD well to TD with best STEERABILITY, PERFORMANCE Highest meters drilled per day in SIS wells East coast (559m/24 hrs)

Ultimate Series ™

XL Forced

East South Australia

Fit-For-Purpose RSS and XL Cutters

  • Region: East Basin, QLD
  • Lithology: Silt st, Sand st, Coal
  • BHA: RSS in Buildup-HZ
  • Bit Type: SUD516VHRPX-PDT3v1
  • Serial #: PDT2034
  • Depth In: 890 m
  • Depth Out: 3,923 TMD
  • Interval Drilled: 3,033m TD
  • On.Btm Hours: 100 hrs
  • On.Btm Av.ROP: 30.3 m/hr
  • Final Dull: 1-1-ER-NO-X-I-NO-TD
Two black cylinders with a metal cap on top.
A black and white image of the logo for pcdtm cut.

Rig Day Savings (USD) by Premium PDT

94,646 $

Actual Days 7.7 Days

Planned 9.41 Days

1.64 Days

A bar graph showing the performance of two sections in a project.
A black screen with a line graph and arrows.

6 1/8’’ MR416-PDT2v2

Performance Report

“Fit For Purpose” design & XL Forced® cutters drilled
DEEPSEST well to TD in Cooper fields-SA
with best Durability & Performance

Moomba Series ™

XL Forced

  • Region: Cooper Basin, SA
  • Lithology: Silt st, Sand st, Basement
  • Bit Type: MR416VHPX-PDT2v2
  • Serial #: S4J4806
  • Depth In: 1627 m
  • Depth Out: 3,483 TMD
  • Interval Drilled: 1,856m TD
  • On.Btm Hours: 80 hrs
  • On.Btm Av.ROP: 23 m/hr
  • Final Dull: 2-3-WT-S-X-I-CT-TD
Premium Drilling Tools2v2 Moomba Series 061 MR416HVPX-M356

6.0 Reamer performance plots-South Australia-2024

End of Well Drilling Performance

Completed the required eval scope with no issues
Note: Winninia North 5 had a larger step out.

Success Metrics

New PDT reamer showed reduction in high doglegs and provided safe working tension loads

Offset Comparison

AiDriller model showed consistent drag in and out compared to the offset Winninia North 5 which did not have the reamer.

FASTDRILLTM 8 ½” SFD416HEPX-PDT2

Performance Report

PDT new design with improved hydraulics & XL Forced® cutters drilled with FASTEST ROP to TD Achieved GREAT Rig Day SAVINGS as new record by “Fit For Purpose” design

Fast Drill Series™

XL Forced

Total PURE Savings by PDT design vs. Offset (USD)

95,005$

Average Offset
0 $/m
PDT Well
0 $/m
Drilled
0 m
Premium Drilling Tools FASTDRILL Series SFD416HEPX-PDT2 Chart & Table

PremiumDT PDC new design PDT2

Performance Report

Santos Limited

Cooper Fields

South Australia

Project Details

  • Region: Cooper Basin, SA
  • Lithology: Abrasive sandstone, siltstone
  • Av. UCS: 6 ~ 25 kpsi
  • Bit Type: MR416PX-PDT2
  • Depth In: 792 m
  • Depth Out: 3,141 TMD
  • Interval Drilled: 2,349 m
  • On.Btm Hours: 70 hrs
  • On.Btm Av.ROP: 34 m/hr
  • Final Dull: 3-4-CT-A-X-I-PN-TD

Total Saving by Premium PDT Design

123,609 $

Offset
0 $/m
PDT Well
0 $/m
Drilled
0 m
A graph showing the amount of depth drilled in south australia.

Precision

Unmatched Efficiency in Drilling Operations

Our tools deliver exceptional performance under the most demanding conditions. Experience reliability and precision that drives success in every project.

90%

Increase productivity with our advanced drilling solutions.

95%

Achieve higher success rates with our innovative technology.